MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Day | June 6, 2025 | 23 | 17 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Haizad Bin Hasan | RIV2 |
| FM Muhammad Yazid bin Abd Rahman | RIV2 |
| Nur Muhammad Amirull Bin Ahmad Faiza | MRV1 |
| Muhammad Habibul Asyraf Bin Burhan | MRV1 |
| Muhammad Syazwan bin Ibrahim | FT1 |
| Muhammad Fakhrul Razin bin Shamsudin | FT2 |
| Ezad Ariff Bin Jamaluddin | FT3 |
| Mohamad Sufian Bin Mohd Lazi | FT4 |
| Muhammad Khuzairi Bin Jaafar | HZ1 |
| Muhammad Norhafizy bin Jalani | TTL |
| Mohd Norhafiz Bin Yusoff | PM1 |
| Abdul Aidil Akram Bin Abdul Rahman | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| Mohd Sahril Bin Yakub | Annual Leave |
| Mohd Haziq Bin Mohd Din | Annual Leave |
| Hafizuddin Bin Ngah | Sick Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 08:00 | SAYA RO AIDIL TERIMA TUGAS OCC DARI PASUKAN BRAVO DALAM KEADAAN BAIK DAN TERKAWAL. |
| 08:05 | STAREX DI PANDU KHUZAIRI LAPOR KE LOT 16 DAN GATE1 |
| 08:15 | STAREX LAPOR SAMPAI BALAI |
| 09:05 | TTL DI PANDU NORHAFIZY LAPOR MEMBUAT ROAD RUNNING |
| 09:20 | TTL LAPOR SAMPAI BALAI |
| 10:31 | EMERGENCY REPORT 1031HRS: OCC RECEIVED A CALL FROM EN. AKHMAR (RSM) VIA DTRS INFORMING THAT THERE IS VAPOR CLOUD AT RFCC TRAIN -2. 1032HRS: OCC ACTIVATED CEFS TEAM MAIN FIRE STATION, AUXILIARY POLICE AND MEDIC BRAVO TO THE LOCATION. 1034HRS: OCC CONTACT SDM INFORM THE INCIDENT SITUATION. 1037HRS: MARSHALL-1 REPORTED ARRIVE AT LOCATION. 1041HRS: MARSHALL 1 REPORTED CONFIRMED THERE IS 1X EMERGENCY REGARDING VAPOUR CLOUD AT AREA 1312 RFCC TRAIN -2. 1042HRS: MARSHALL 1 REPORTED PRODUCT DIESEL (HEAVY HYDROCARBON) 1045HRS: MARSHALL 1 REPORTED FT3 USED GUNDECK FOR COOLING AT PIPING LINE RAINDOWN METHOD. 1053HRS: OSC REPORTED THERE NO VALVE TO ISOLATE UNTIL PLANT SHUTDOWN. 1104HRS: MARSHALL 1 REPORTED CEFS TEAM SETUP TTL TO PERFORM COOLING AT PIPING LINE. 1114HRS: MARSHALL 1 REPORTED TTL OPRATED BY FF NORHAFIZY. 1218HRS: MARSHALL 1 REPORTED TTL REPLACE WITH FT4 FOR CONTINUE COOLING ACTIVITY. 1301HRS: MARSHALL 1 REPORTED OPERATION STILL COOLING ACTIVITY. 1312HRS: MARSHALL 1 REPORTED FT3 REPLACE WITH FT2 FOR CONTINUE COOLING ACTIVITY. 1323HRS: MARSHALL 1 REPORTED 3 PERSONEL CEFS TEAM WITH 2 PERSONEL ERT GOING UP TO SETUP GROUND MONITOR AT EFFECTED AREA. 1336HRS: MARSHALL 1 REPORTED GROUND MONITOR SETUP AT EFFECTED AREA COMPLETED. 1413HRS: MARSHALL 1 REPORTED STILL CONTINUE COOLING ACTIVITY BY USED GROUND MONITOR. 1502HRS: MARSHALL 1 REPORTED CONTINUE COOLING USED HYDRANT WITH SIEMESE ADAPTOR AND 400 FEET HOSE WITH GROUND MONITOR. 1520HRS: MARSHAL 1 REPORTED ONLY REMAINING ASHPALT PRODUCT ON COLUMN. 1530HRS: MARSHALL 1 REPORTED 2 PERSONAL CEFS WITH 1 PERSONAL ERT CONDUCT OVERHAUL ACTIVITY. 1535HRS: MARSHALL 1 REPORTED OVERHAUL ACTIVITY COMPLETED 1540HRS: OSC DELCLARE OPERATION STANDOWN. 1555HRS: MARSHALL 1 REPORTED ALL EMERGENCY RESPONSE VEHICLE BACK TO MFS EXCEPT FT2 STAY STANDBY FOR THE CRITICAL ACTIVITY BY FF HABIBUL AND FF RAZIN. 1605HRS: ALL EMERGENCY VEHICLE SAFELY ARRIVE AT MFS. |
| 17:10 | FT3 DI PANDU EZAD BERSAMA AMIRUL LAPOR KE RFCC UNTUK PERTUKARAN STANDBY |
| 17:30 | FT2 DI PANDU HABIBUL BERSAMA RAZIN LAPOR BALIK KE BALAI |
| 18:20 | FT2 LAPOR SAMPAI BALAI |
| 19:14 | FT3 LAPOR BALIK KE BALAI |
| 19:25 | FT3 LAPOR SAMPAI BALAI |
| 20:00 | SAYA RO AIDIL SERAH TUGAS OCC KEPADA PASUKAN CHARLIE DALAM KEADAAN BAIK DAN TERKAWAL. |
Verification
| Check by : Abdul Aidil Akram Bin Abdul Rahman | Verify by : SFM Haizad Bin Hasan |
|---|---|
| DIL | Haizad |