MAIN FIRE STATION OCCURRENCE REPORT
| Shift | Shift Cycle | Date | Emergency | Drill |
|---|---|---|---|---|
| DELTA MFS | Night | June 1, 2025 | 20 | 16 |
Shift Manning
| Name | Vehicle |
|---|---|
| SFM Suhaimi Bin Kassiron | RIV2 |
| FM Muhammad Yazid bin Abd Rahman | RIV2 |
| Nur Muhammad Amirull Bin Ahmad Faiza | MRV1 |
| Abdul Aidil Akram Bin Abdul Rahman | MRV1 |
| Ahmad Aizat Bin Samad | FT1 |
| Muhammad Syazwan bin Ibrahim | FT2 |
| Muhammad Khuzairi Bin Jaafar | FT3 |
| Mohd Sahril Bin Yakub | FT4 |
| Mohd Haziq Bin Mohd Din | HZ1 |
| Muhammad Fakhrul Razin bin Shamsudin | TTL |
| Mohd Norhafiz Bin Yusoff | PM1 |
| Mohamad Sufian Bin Mohd Lazi | - |
Staff On Leave
| Name | Leave Type |
|---|---|
| SFM Haizad Bin Hasan | Sick Leave |
| Hafizuddin Bin Ngah | Hospitalization Leave |
| Ezad Ariff Bin Jamaluddin | Hospitalization Leave Family Member |
| Muhammad Habibul Asyraf Bin Burhan | Annual Leave |
Occurrence Book Entry
| Time | Remarks |
|---|---|
| 20:05 | OCC LAPOR TUGAS KEPADA MANAGER BERTUGAS |
| 20:10 | ANGGOTA BERTUGAS MEMBUAT UJIAN RADIO KEPADA OCC |
| 20:15 | ANGGOTA BERTUGAS MEMBUAT PEMERIKSAAN PERALATAN DAN JENTERA BERTUGAS |
| 21:07 | STAREX DIPANDU AIDIL KE SG RENGIT BELI MAKANAN |
| 21:14 | EMERGENCY REPORT 2114 HRS: OCC RECEIVED A CALL FROM MR IZZUL (PRPC STAFF) VIA HOTLINE PHONE, INFORMING THAT THERE WAS A BEE NEST NEAR (275KV TRANSMISSION LINE NEAR AT WETLAND). 2114 HRS: OCC ACTIVATED THE CEFS TEAM TO RESPOND TO THE INCIDENT AREA. 2115 HRS: FM-1 REPORTED 4 CEFS PERSONNEL WITH EMERGENCY VEHICLES (FORD RANGER AND MRV1) DEPLOYED TO THE LOCATION. 2119 HRS: FM-1 REPORTED ARRIVAL AT THE EXACT LOCATION OF THE BEE NEST. 2122 HRS: FM-1 CONFIRMED THAT THE BEE NEST WAS LOCATED AT SMALL TREE, WITH AN ESTIMATED SIZE OF 1 FT X 1 FT. 2125 HRS: FM-1 REPORTED SETUP OF 2 RESPONDERS, FULLY EQUIPPED WITH BEE SUITS AND 2 BAYGON. SPRAYS. 2131 HRS: FM-1 REPORTED THAT THE OPERATION TO REMOVE THE BEE NEST HAD BEGUN. 2149 HRS: FM-1 REPORTED THE BEE NEST WAS SUCCESSFULLY DESTROYED AND THE AREA DECLARED SAFE. 2150 HRS: FM-1 REPORTED THAT OVERHAUL PROCEDURES WERE ONGOING. 2151 HRS: FM-1 DECLARED THE OPERATION STAND DOWN. 2158 HRS: CEFS TEAM RETURNED TO THE MAIN FIRE STATION. 2202 HRS: CEFS TEAM SAFELY ARRIVED AT THE MAIN FIRE STATION. |
| 21:58 | MRV 1 DIPANDU AMIRUL BERSAMA SAHRIL KE RAPID SITE UNTUK FSP |
| 22:30 | STAREX SAMPAI BALAI |
| 23:32 | MRV I SAMPAI BALAI |
| 06:00 | ANGGOTA BERTUGAS MEMBUAT PEMBERSIHAN JENTERA DAN KAWASAN BALAI. |
| 07:03 | STAREX DIPANDU AIDIL KE GATE 1 AMBIL ANGGOTA |
| 07:30 | ANGGOTA BERTUGAS MEMBUAT SERAHAN TUGAS KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL |
| 07:35 | STAREX SAMPAI BALAI |
| 08:00 | SAYA RO SUFIAN SERAH TUGASAN OCC KEPADA PASUKAN ALPHA DALAM KEADAAN BAIK DAN TERKAWAL |
Verification
| Check by : Mohamad Sufian Bin Mohd Lazi | Verify by : SFM Suhaimi Bin Kassiron |
|---|---|
![]() |
![]() |